| |
| Richard C. Buchan |
 |
 |
 |
 |
3
7 1 4 N o r m a n L o o p R
o u n d R o c k, T X 7 8 6 6 4
(5 1 2 ) 5 5 7 - 4 2 8 7 |
 |
| Objective: |
|
To
make a positive contribution to a quality, team-oriented
company; utilizing my skills and initiative in
scheduling, as well as material and production
planning, to contribute to the company’s
goals and objectives. |
 |
| Education: |
|
Currently
pursuing BS in Business Management |
|
 |
| Experience: |
|
Project
Manager / Sr. Analyst |
10/2006
- 07/2007 |
|
|
|
Dell,
Inc. , Round Rock, TX |
|
|
|
 |
Managed various prototype projects from BOM conception
to |
| |
|
|
finished
product. |
|
|
|
 |
Worked with Engineering to manage BOM revision
changes, |
| |
|
|
including
follow-up. |
|
|
|
 |
Managed Dell's Lead-Free Server initiative to
qualify five |
| |
|
|
overseas
electronic manufacturers, from BOM conception,
kitting, tracking, and procurement of all parts,
to final shipment to EMs. |
|
|
|
 |
Member of Dell Prototype Engineering team that
planned and |
| |
|
|
built
new desktop, laptop, and server platform products
from conception to completion. |
|
|
|
 |
Coordinated with Engineering to phase in design
changes, and |
| |
|
|
rework
current jobs to meet ship date expectations. |
|
|
|
 |
Worked with Finance Managers to control costs
and meet |
| |
|
|
budgets
requirements. |
|
 |
|
|
Master
Scheduler / Sr. Planner-Buyer |
10/2004
- 09/2006 |
|
|
|
Loud
Engineering & Manufacturing, Ontario, CA |
|
|
|
 |
Responsible
for Master Schedule, with primary focus on |
| |
|
|
navigating
the financial direction of the company, as well
as capacity planning and shop loading. Set and
implemented plan to meet company’s $21 million
shipping goal. |
|
 |
|
|
 |
Led
Planning Group to record $6.5 million shipped
for Q4 2005. |
|
 |
|
|
 |
Followed
with record Q1 and Q2 of 2006, 12% and 18% above |
| |
|
|
goal,
respectively. |
|
 |
|
|
 |
Interacted
daily with Senior Management to identify machine
|
| |
|
|
shop
bottlenecks and recommend resources to improve
processes. |
|
 |
|
|
 |
Set
up creative buy-and-hold agreements with steel
suppliers to |
| |
|
|
offset
industry-wide eaw material shortages. |
|
 |
|
|
 |
Worked
and succeeded to increase annual inventory turns
from |
| |
|
|
3.9
to 5.1. |
|
 |
|
|
 |
Successfully back shifted company-wide completion
times by one |
| |
|
|
week,
to allow recovery time for last-minute obstacles
(assembly errors, late supplier, source inspection,
etc.) |
|
 |
|
|
 |
Set long-term agreement in place with strong supplier,
saving |
| |
|
|
approximately
25% off standard price. |
|
 |
|
|
 |
Responsible for MPS level scheduling for company,
including |
| |
|
|
production,
repair and overhaul groups. |
|
 |
|
|
 |
Firm grasp of scheduling philosophies, including
level-loading |
| |
|
|
and
“even-flow”. |
|
 |
|
|
 |
Responsible for production planning of CH-47 Chinook
Helicopter |
| |
|
|
landing
gear, including material purchase through shop
floor manufacture. Planned, built, and shipped
a record 24 gear sets in eight months. |
|
 |
|
|
 |
Maintained on-time delivery for my product line
10% above |
| |
|
|
target. |
|
 |
|
|
 |
Coordinated with Engineering to phase in design
changes, and |
| |
|
|
rework
current jobs to meet customer ship date expectations. |
|
 |
|
|
 |
As buyer saved approximately 8-10% by setting
up price |
| |
|
|
de-escalation
schedules for new machined parts, as suppliers
matured through learning curve. |
|
 |
|
|
 |
Team Leader in Value Stream Mapping project, which
resulted |
| |
|
|
in
a reduction in setup time by 60%, and reduced
cycle time of most difficult part by 8 weeks. |
|
 |
|
|
 |
Evaluated and managed customer furnished material
inventory |
| |
|
|
levels,
keeping 100% accuarcy. |
|
 |
|
|
 |
Highly proficient in understanding and implementing
Lean |
| |
|
|
Manufacturing
concepts. |
|
 |
|
|
 |
Participation in multiple Kaizen event teams to
improve various |
| |
|
|
manufacturing
processes. |
|
 |
|
|
 |
Implemented JD Edwards, an ERP system, enabling
a smooth |
| |
|
|
transition
ahead of deadline. |
|
 |
|
|
Sr.
Planner-Buyer |
03/2003
- 10/2004 |
|
|
|
Contract
Employee - Volt Technical Services |
| |
- |
Northrop Grumman,
Redondo Beach, CA |
| |
- |
Kaiser Electroprecision
/ Rockwell Collins, Irvine, CA |
| |
- |
Adams Rite Aerospace,
Fullerton, CA |
|
|
|
 |
Responsible for production planning of Embraer
190 rear |
| |
|
|
stabilizer
actuator, including material purchase through
shop floor manufacture (Kaiser). |
|
 |
|
|
 |
Responsible for production planning for two separate
product |
| |
|
|
lines
– from entire material purchase (raw and
component) through shop floor manufacture of all
sub-assemblies, to final assembly and shipping
(Adams Rite). |
|
 |
|
|
 |
Worked closely with Engineering Department (both
Design and |
| |
|
|
M.E.) to solve a variety of issues, including
machining process improvement and redline drawing
management. |
|
 |
|
|
 |
Supported Sales Team to meet customer demand,
including the |
| |
|
|
reduction of standard lead times by 35-50% of
all items in my product lines (Adams Rite). |
|
 |
|
|
 |
Refined my knowledge and skills in all areas of
manufacturing, |
| |
|
|
including the use of MRP, forecasting, planning,
recovery planning, machining, and assembly. |
|
 |
|
|
Self-Employed |
07/2001
- 02/2003 |
|
 |
|
|
Buyer
/ Planner |
08/1998
- 06/2001 |
|
|
|
Extron
Electronics, Anaheim, CA |
|
|
|
 |
Responsible for purchasing connectors, capacitors,
IC's, switches, |
| |
|
|
relays,
resistors, and all other types of electronic components. |
|
 |
|
|
 |
Sheet Metal and Hardware Buyer of all machined
and/or |
| |
|
|
fabricated
parts. |
|
 |
|
|
 |
Read and understand blueprints and CAD drawings. |
|
 |
|
|
 |
Primary PCB Buyer for two years, working with
local PCB |
| |
|
|
manufacturers. |
|
 |
|
|
 |
Established KAN BAN style inventory management
program. |
|
 |
|
|
 |
Planner for Cable Assemblies / Harness Assemblies. |
|
 |
| Technical: |
|
MS Word, MS EXCEL, MS PowerPoint,
MS Project, MS Access, |
| |
|
Macromedia Dreamweaver, Oracle, MAPICS,
JD Edwards, SAP, Oracle 11i, Ariba Spend Management, InfoFlo,
and Global Shop. |
|
 |
| References: |
|
Available upon . |
|
| |